Operations

We strive to carryout our operations safely and competently. We undertake planned maintenance and capital work, using a healthy mix of in-house resource, expertise from other Risk Management Authorities, consultants and contractors. We also undertake rechargeable work on behalf of riparian owners, Flood and Coastal Erosion Risk Management Authorities and other third parties, and, we respond to emergency situations and other events as and when they arise, which all helps keep the Board’s District safe:

Planned Maintenance work
Balancing Flood and Coastal Erosion Risk Management with the Environment
Planned work to tackle non-native invasive species
Inspection of the Drainage Infrastructure
Rechargeable work
Emergencies and Incident Response
Other work

Planned Maintenance work

The Board undertakes a number of routine maintenance operations periodically. Principle operations include:

  • Pump operating, servicing and repairs
  • Water Level Control Structure operating, servicing and repairs
  • Weed cutting and de-silting
  • Bushing and tree coppicing
  • Mowing and control of bankside vegetation

The Board also undertakes other planned maintenance operations such as slip repairs, pipeline inspections, culvert cleansing, repairs and renewals. Please check out our Work Programmes webpage for a comprehensive list of planned maintenance works.

Balancing Flood and Coastal Erosion Risk Management with the Environment

We recognise that our watercourses are not just Engineering Structures but are also Wildlife Corridors. As such we seek to ensure that important wildlife and their habitats are not endangered by our operations, or during periods of drought. The Board’s Biodiversity Action Plan, Biosecurity and Standard Maintenance Operations (SMO) policy documents clearly set out how we intend to achieve this.

The SMO policy document has been based on the Drainage Channel Biodiversity Manual produced by ADA and Natural England in 2008, and the Channel Management Handbook together with the Pevensey Levels Water Level Management Plan which were both produced by the Environment Agency in 2015. The SMO has been approved by Natural England and is both ISO 9001 and 14001 quality assured. We also seek to reduce our carbon footprint by undertaking work in the most carbon efficient and sustainable manner.

Planned work to help tackle non-native invasives

The Board has a comprehensive programme to help manage the issue of non-native invasive species:

Inspection of the Drainage Infrastructure

The condition of our drainage infrastructure is periodically assessed by trained Asset Surveyors to ensure that it remains fit for purpose and meets today’s health and safety requirements. The results of our visual asset inspections inform the planned maintenance and capital works programmes for future years.

Much of our Drainage Infrastructure is at the end of its economic life and needs replacing or extensively refurbishing. Whilst the necessary improvements are now scheduled in the capital programme, if the infrastructure fails before we can do the work, we must be able to respond immediately and make the necessary repairs.

Rechargeable work

We undertake rechargeable work on behalf of riparian owners, flood and coastal erosion risk management authorities and other third parties. We also undertake out of hours emergency work and have a robust and experienced team to implement a variety of emergency flood, drainage and civil engineering response tasks. Whilst our hourly charge-out rates are competitive they may not always be the lowest. However our price for doing the job is still likely to be competitive because we’re able to complete the work more quickly than most, with minimal supervision, and, without causing any damage on-site. This is achieved by only ever using experienced operatives and having access to robust technical support and the most appropriate equipment for doing the job. If you would like us to quote for some work please contact either the Operations Manager or any one of our Technical Support team, who will be pleased to give you a fixed price for the job.

Emergencies

We respond to emergencies during periods of high rainfall and during tidal surge events, utilising our workforce, Board membership and state of the art telemetry system. We work closely with other operating authorities and have detailed how we shall respond in an emergency situation on our Emergencies webpage.

Other work

We have to contend with an increasing amount of fly-tipping, which is blighting our landscape, costly to manage and bad for the natural environment. It is becoming the ‘new crop’ in and around the area. We are working with the Councils and the Environment Agency to collectively help tackle the problem, in accordance with our Fly Tipping Policy.

         

Contact details

During office hours
(between 8.30 am and 5.30 pm)
Tel: +44(0)1553 819600
Fax: +44(0)1553 819639
Email: info@wlma.org.uk

Central Office: Kettlewell House, Austin Fields
Industrial Estate, King's Lynn, Norfolk, PE30 1PH

Out of hours

Please contact the Duty Officer on +44(0)7881 581521 or send an email to dutyofficer@wlma.org.uk. Otherwise if you know who you need to contact in an emergency, please refer to the Member Board’s ‘Contact us’ webpage on this site for their out of hours contact details.

Back to Top